Flood Reinstatement

Ashton Keynes Flood Recovery

Ashton Keynes, Cotswolds

Role

Emergency response to brook flooding

Scope

Ground floor refurbishment including UFH, tanking, tiling and joinery

Description

The project involved the refurbishment of the ground floor of a beautiful, large, Cotswold stone house following a local brook bursting its banks and rising over the floodplain. 


S Devs were contracted to strip out the property as part of the emergency response to aid drying, and then to reinstate all finishes of the affected rooms, including UFH, tiling, part tanking, joinery and decorations.